In order to examine the load-bearing capacity of Klingerbrücke in Leipzig, the Supporting Structures and Noise Abatement division of MFPA Leipzig GmbH carried out load testing using the company’s own load testing vehicle (BELFA).
The objective was to review the structure’s reaction to a future additional load from new trams using the bridge under realistic conditions in a set period of time. After the measuring technology had been set up and installed, the tests were carried out in multiple load levels, steps and cases based on the structure’s bending.
More projects
Load testing in the context of converting the former Aktienspinnerei building in Chemnitz into the central library of the Chemnitz University of Technology
Experimental structural safety verification of historical cast iron columns in the old Chemnitz…
Analysis of concrete cover, reinforcement layer and diameter
Non-destructive determination of the position and cover of reinforcing bars in concrete. The…
Determination of the fire resistance of a loaded laminated beech veneer lumber column
To investigate the behavior of prefabricated prestressed concrete floors (prestressed concrete…